SERVICES

Centrally located in Jacksonville, Texas, our 24-hour production facility offers 75,000 square feet of manufacturing capability backed by

50+ YEARS of EXPERIENCE

Secondary Operations

We offer a full complement of secondary and assembly operations to enhance your components. Let us handle your entire project. Ask about any additional services you may need, including:

  • Assembly

  • Shrink Wrapping

  • Heat Staking

  • Solvent Bonding

  • Heat Transfer Printing & Hot Stamping

  • Custom Packaging

  • Drilling & Tapping Services

  • Insert Molding

  • Milling & Cutting

  • Part Bagging & Labeling

  • Sonic Welding

Flexible and Reliable

With decades of experience under our belt, the team at D&L is happy to consult with you on your custom project needs. Our wide range of capabilities afford us opportunities to serve you better and more efficiently than other production facilities. Let us know how we can serve as your production partner!

  • Full spectrum of equipment and technology

  • Expedient and conscientious customer support

  • Unwaivering commitment to quality control

  • Stringent oversight of Standard Operating Procedures

  • Progressive pursuit of streamlined processing

SCOPE of WORK

Injection Molding
Specialty Services
Custom Tooling

HOURS

Production 24 Hours
Office 8 am-5 pm
Delivery 7 am-4 pm

   903-586-9894

LOCATION

Quality is our First Concern

SECOND TO NONE

Our goal is to exceed our customers’ expectations in every way.

At D&L, zero defects is our consistent goal

From precision, tight-tolerance components to large part packouts, the dedicated team at D&L is prepared to make your project a total success at the quality you demand with on-time delivery.

To that end, we incorporate STRINGENT CHECKPOINTS at each level of the production and fulfillment process:

  • We are inspected quarterly by Universal Laboratories to ensure product compliance, safety, and material traceability exceeds all standards.

  • We use standard measuring devices and scales that are calibrated on a regular basis.

  • Our highly-trained machine operators perform a visual inspection of every part using parameters and critical dimensions set by you the customer — all rejects are identified and removed

  • Our shift quality personnel perform random checks and critical measurements of all production hourly (or more as needed) and any rejects are corrected and logged per procedure.

  • Acceptable parts are boxed, counted and transferred to our Quality Assurance Department where they are inspected once again by our QA Manager, who confirms count and releases for shipping.

Bulk Storage

Silo storage of raw materials “frees up” valuable warehouse space and decreases labor requirements, allowing for a lower part cost. Each D&L silo has the ability to receive full bulk trucks with a storage capacity of 50 thousand pounds per silo.

Industrial Forklifts

To ensure safe and efficient handling and transport of your product, D&L incorporates heavy duty fork trucks to make light work of loading and storage.

24 Hour Production

With a triple-shift production schedule, D&L has the ability to deliver exceptional products at exceedingly-competitive costs – resulting in a considerable advantage for our operating budget as well as our customers’ bottom line.